11. Should testing be done only after the build and execution phases are complete?

In traditional testing methodology testing is always done after the build and execution phases.

But that's a wrong way of thinking because the earlier we catch a defect, the more cost effective it is. For instance, fixing a defect in maintenance is ten times more costly than fixing it during execution.

In the requirement phase we can verify if the requirements are met according to the customer needs. During design we can check whether the design document covers all the requirements. In this stage we can also generate rough functional data. We can also review the design document from the architecture and the correctness perspectives. In the build and execution phase we can execute unit test cases and generate structural and functional data. And finally comes the testing phase done in the traditional way. i.e., run the system test cases and see if the system works according to the requirements. During installation we need to see if the system is compatible with the software. Finally, during the maintenance phase when any fixes are made we can retest the fixes and follow the regression testing.

12. Are there more defects in the design phase or in the coding phase?

The design phase is more error prone than the execution phase. One of the most frequent defects which occur during design is that the product does not cover the complete requirements of the customer. Second is wrong or bad architecture and technical decisions make the next phase, execution, more prone to defects. Because the design phase drives the execution phase it's the most critical phase to test. The testing of the design phase can be done by good review. On average, 60% of defects occur during design and 40% during the execution phase.





13. What group of teams can do software testing?

When it comes to testing everyone in the world can be involved right from the developer to the project manager to the customer. But below are different types of team groups which can be present in a project.


• Isolated test team
• Outsource - we can hire external testing resources and do testing for our project.
• Inside test team
• Developers as testers
• QA/QC team.

14. What impact ratings have you used in your projects?

Normally, the impact ratings for defects are classified into three types:


• Minor: Very low impact but does not affect operations on a large scale.
• Major: Affects operations on a very large scale.
• Critical: Brings the system to a halt and stops the show.

15. Does an increase in testing always improve the project?

No an increase in testing does not always mean improvement of the product, company, or project. In real test scenarios only 20% of test plans are critical from a business angle. Running those critical test plans will assure that the testing is properly done. The following graph explains the impact of under testing and over testing. If you under test a system the number of defects will increase, but if you over test a system your cost of testing will increase. Even if your defects come down your cost of testing has gone up.